Jerm
Sun 8/21/05, 11:48AM
Looks like they have begun repaving on San Gabriel Cyn Rd. where the road has been ripped up starting from the bridge (East Fork Rd.).
Looks like they are doing it in 2 mile sections. Other then that, GMR (before closure) and the Ridge still are :cool:
Looks like they are doing it in 2 mile sections. Other then that, GMR (before closure) and the Ridge still are :cool: